belarus
The project was energized in 2021 with an overall capacity of 1,000 megawatts, and currently, 115 megawatts are operational. The total Operational Hash Rate stands at 3.6E, making it the largest individual project in Europe. The region's temperature does not exceed 30°C, and with winter lasting up to 7 months, it provides an optimal environment for operational uptime. The operational uptime consistently remains above 98%. The facility design is an integrated collaboration with multiple design institutes. The average cost per megawatt is $120,000."